Working in the Dead Sea is a big challenge by itself since it's one the most aggressive environments in the world, the most salty brine and the lowest land point on earth.
The project was to supply and install of fully automatic geotechnical monitoring instrumentation system for a 10 km long dam (fill-embankment) including 610 Vibrating Wire Piezometers, 33 Inclinometers, 42 Extensometers, 37 Standpipe Piezometers with pressure transducers and 7 full automatic data loggers equipped with wireless routers connected to WMS data management software.
Supply and installation of geotechnical monitoring instrumentation system consists of:
Supply and installation of Automatic Geotechnical Monitoring Instrumentation System consists of:
Early Warning Flooding Alarm System covers 15 km D/S Wadi Bed
Climatological Station
Supply and Installation of Monitoring Instrumentation System to measure water pressure and water level, the system consists of 37 V. W. Piezometers and 5 Water Level Transducers in addition to manual readout units.
Supply and installation of fully automatic geotechnical system to monitor various critical factors during the construction of Al-Birkah tunnels (Bus Station Project) in the holly city Makkah.
The system consists of different types of instrumentation such as:
* The project in hold
3 years contract to operate and maintain Jeddah protection dams including the operation and maintenance of flooding alarm system and geotechnical monitoring systems in addition to CCTV system.
Supply and Installation of Automatic Geotechnical Monitoring system to Arada dam project including the following instruments:
Supply and Installation of Early warning system on 20 dams all over the Kingdom including the most powerful 3000W electronic sirens, the project is under construction, covering most of Saudi regions.
Totally 84 Sirens installed in addition to water level sensors for automatic alarm triggering.
Supply and Installation of Geotechnical Monitoring System on the RS2 lifting shaft in the holly city Makkah.
The project included Borehole extensometers and Inclinometers in addition to Vibrometers.
Supply and installation of full automatic geotechnical monitoring system, Climatological stations and early flooding warning system covering 30 km D/S
Supply and Installation of 37 Inclinometer systems to monitor the lateral displacement of foundation and embankment. Reading Inclinometers and data analysis.