technofalak
  • Home
  • Services
  • REFERENCES
  • Contact Us
  • Gallery
  • About
  • CERTIFICATES
  • More
    • Home
    • Services
    • REFERENCES
    • Contact Us
    • Gallery
    • About
    • CERTIFICATES
  • Sign In
  • Create Account

  • Bookings
  • My Account
  • Signed in as:

  • filler@godaddy.com


  • Bookings
  • My Account
  • Sign out

technofalak

Signed in as:

filler@godaddy.com

  • Home
  • Services
  • REFERENCES
  • Contact Us
  • Gallery
  • About
  • CERTIFICATES

Account


  • Bookings
  • My Account
  • Sign out


  • Sign In
  • Bookings
  • My Account

DIKE19 DAED SEA AREA

PROJECT: Rehabilitation of Dike #19

Working in the Dead Sea is a big challenge by itself since it's one the most aggressive environments in the world, the most salty brine and the lowest land point on earth.

     

The project was to supply and install of fully automatic geotechnical monitoring instrumentation system for a 10 km long dam (fill-embankment) including 610 Vibrating Wire Piezometers, 33 Inclinometers, 42 Extensometers,   37 Standpipe Piezometers with pressure transducers and 7 full automatic data loggers equipped with wireless routers connected to WMS data management software.     

PROJECT: Wala Dam Rising

Supply and installation of geotechnical monitoring instrumentation system consists of:

  • 3D Electrical Joint Meter (29 set)
  • Earth Pressure cells (8 No.)
  • Pore Pressure Cells ( 3 No.)
  • Load cells (16 No.)
  • Topographic reference pins (22 No.)
  • Switch terminal boxes and readout units
  • Dilapidation Survey of existing tunnels. 

PROJECT: 1 Million Water Tank - Holly Makkah

  1. Supply and installation of Casagrande Monitoring Wells and Vibrating Wire Piezometers with Automatic data loggers.
  2. Carrying out Geophysical MASW Inspection Survey 

PROJECT: QANOUNA DAM

Supply and installation of Automatic Geotechnical Monitoring Instrumentation System consists of:

  • 44 Concrete Thermometer
  • 28 3D electrical Jointmeter
  • 5 Uplift Pressure Manometer
  • 3 Accelerometers
  • 4 Pendulum (Normal and Inverted)
  • 4 Monitoring Wells with Pressure transducers


Early Warning Flooding Alarm System covers 15 km D/S Wadi Bed

Climatological Station   


PROJECT: Um Wael Phosphate Mines

Supply and Installation of Monitoring Instrumentation System to measure water pressure and water level, the system consists of 37 V. W. Piezometers and 5 Water Level Transducers in addition to manual readout units.  


PROJECT: ALBIRKA TUNNELS IN HOLLY MAKKAH

Supply and installation of fully automatic geotechnical system to monitor various critical factors during the construction of Al-Birkah tunnels (Bus Station Project) in the holly city Makkah.

The system consists of different types of instrumentation such as:

  • Borehole Extensometers to measure underground settlement above the tunnel
  • Inclinometers (36)
  • Multipoint extensometers inside the tunnel (28)
  • Strain gauges (132)
  • Electrical Crackmeter (84)
  • Vibrometer (18)
  • H-Level Liquid Level System for settlement measurement (11 sets)
  • Tiltmeters (11)
  • Automatic data loggers (11)

                                                                                                                                  * The project in hold 



PROJECT: JEDDAH PROTECTION DAMS

3 years contract to operate and maintain Jeddah protection dams including the operation and maintenance of flooding alarm system and geotechnical monitoring systems in addition to CCTV system. 

                                                                                                                             


PROJECT: ARADA DAM

Supply and Installation of Automatic Geotechnical Monitoring system to Arada dam project including the following instruments:

  • Vibrating Wire Piezometers (50 No.)
  • Crackmeters (82 No.)
  • Pendulums (14 No.)
  • Uplift pressure instruments 
  • Thermometers (38 No.)
  • Accelerometers (3 No.)
  • Automatic data loggers (2 No.)                                                                                                                            


PROJECT: EARLY ALARM SYSTEMS ON DAMS

Supply and Installation of Early warning system on 20 dams all over the Kingdom including the most powerful 3000W electronic sirens, the project is under construction, covering most of Saudi regions.

Totally 84 Sirens installed in addition to water level sensors for automatic alarm triggering.                                                                                                                       


PROJECT: RS2 LIFTING SHAFT - HOLLY MAKKAH

Supply and Installation of Geotechnical Monitoring System on the RS2 lifting shaft in the holly city Makkah.

The project included Borehole extensometers and Inclinometers in addition to Vibrometers.                                                                                                                     


PROJECT: YABA DAM (UNDER CONSTRUCTION)

Supply and installation of full automatic geotechnical monitoring system, Climatological stations and early flooding warning system covering 30 km D/S                                                                                                                 


PROJECT: DREDGING, RECLAMATION AND MARINE FACILITIES FOR KING SALMAN INTERNATIONAL COMPLEX FOR MARITIME INDUSTRIES AND SERVICES PROJECT – KSIC

Supply and Installation of 37 Inclinometer systems to monitor the lateral displacement of foundation and embankment.  Reading Inclinometers and data analysis.                                                                                                            


Copyright © 2016 technofalak - All Rights Reserved.